Proven Result

Retail Chain Rollout

5,000+ store kits produced, kitted, and delivered nationwide in 72 hours — consistent, on-brand, and on time.

Scroll
5,000+
Kits Produced
72 Hours
End-to-End Turnaround
0
Missed Launch Dates

The Challenge & Our Approach

Thousands of stores. Tight timeline. Flawless execution — from print to kitting to last-mile delivery.

What needed to happen

A nationwide retailer needed a synchronized, coast-to-coast launch for new in-store signage. Kits had to be custom-packed by store, verified for accuracy, and delivered within a three-day window.

High-capacity production
Offset + digital lines ran in parallel with standardized color targets and materials.
Smart kitting
Per-store bill-of-materials, scan-verified kitting, and damage-resistant packaging.
Logistics orchestration
Carrier mix optimized for speed/cost, with staging rules by region and store hours.
QA & tracking
Scan points at kit close and dock; live tracking and exception handling to avoid delays.

Execution in Four Moves

Streamlined flow keeps speed high and risk low.

1

Preflight & Color

Batch preflight and proofing; calibrated color targets across presses for uniform output.

2

Parallel Production

Offset for volume, digital for variants; synchronized lot codes and pallet maps.

3

Kitting by Store

Scan-verified pick/pack by store BOM; protective packing and clear open-box instructions.

4

Staged Delivery

Region-based staging, carrier mix, and proactive exception management to hit the window.

99.8%
On-time Delivery Rate
100%
Store Coverage
Zero
Reprints for Color Variance

“Printwell got every store live by Monday. Kits were accurate, labeled, and easy for our teams to deploy. It just worked.”

Senior Marketing Ops Manager, National Retailer

Need a launch this fast?

Let’s engineer a rollout playbook for your brand.

Request a Quote